Wind Farm Grid Connection Study, Ukraine
Wind Farm Grid Connection Study, Ukraine
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- PQ Chart
- Voltage control
- Energy Losses
- Protection coordination (directional overcurrent, distance and differential)
- Power quality (harmonic distortion, flicker and resonance)
- LVRT
Technical Information
- Connection: 330kV
- Turbine type: DFIG
- Zaporizka WPP
- Capacity: 225 MW
Client
EuroCape, MonacoPartners
GE; -
Wind Farm Pre-Design Study, Ukraine
Wind Farm Pre-Design Study, Ukraine
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- Voltage control
- Grid stability study
- Transient and oscillation stabilities
- LVRT
Technical Information
- Capacity: 500 MW
- Connection: 330 kV
- Turbine: FCWG
Client
EuroCape, MonacoPartners
Vestas; -
Wind Farm Grid Code Compliance Study, Belgium
Wind Farm Grid Code Compliance Study, Belgium
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- Reactive power production
- Wind farm’s capability curves
- Adjustment of the dynamic models of WTG
- Small-signal stability
- Transient analysis (FRT, Reactive droop, voltage regulation, frequency changes)
- Interaction study
- Voltage control concept
Technical Information
- Capacity: 16,5 + 21 MW
- Connection: 36 kV
- Turbine: DFIG, FCWG
- Wind Farm: Electrabel & Storm
- WTG: Senvion, Vestas
Client
Elia, BelgiumContractor
Tratebel Engineering S.A.Partners
Vestas; -
Wind Farm Network Connection Study, Ukraine
Wind Farm Network Connection Study, Ukraine
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- Voltage/reactive power control
- Power quality (flicker and harmonics)
- Energy Losses
Technical Information
- Capacity: 69 MW + 69 MW
- Connection: 150 kV
- Turbine: FCWG
- Wind Farm: Overyanivska & Novotroitska
Client
Vindkraft, Ukraine -
FACTS feasibility study for integration of 5 PV Plants into the distribution network, Ukraine
FACTS feasibility study for integration of 5 PV Plants into the distribution network, Ukraine
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- N-1, N-2 Contingency analysis
- Voltage control
- Voltage fluctuation Study
- STATCOM application
Technical Information
- Capacity: 210 MWp
- Connection: 110 kV
- PV Solar Plant
Client
Activ Solar, AustriaContractor
Activ SolarPartners
VS-Energy; -
PV Solar Plant Network Connection study, Ukraine
PV Solar Plant Network Connection study, Ukraine
Project Categories
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- N-1, N-2 Contingency analysis
- Voltage control
- PQ Chart
Technical Information
- Capacity: 175 MWp
- Connection: 150 kV
- PV Solar Plant
Client
Activ Solar, AustriaContractor
Greentek Energy Ltd -
Research project on influence of PVs’ power fluctuations to frequency and voltage in the IPS of Ukraine, Ukraine
Research project on influence of PVs’ power fluctuations to frequency and voltage in the IPS of Ukraine, Ukraine
Project Categories
- Transmission
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- Transient and oscillation stabilities
- Sensitivity dV/dQ
- Simulation of frequency fluctuation
- Study of isolated operation of IPS of Ukraine
- Developing requirements on active and reactive power control
Technical Information
- IPS of Ukraine
- 220-750 kV Grid
- PV Solar Plant
- AGC
Client
Activ Solar, AustriaContractor
Greentek Energy LtdPartners
NPC Ukrenergo; -
Master Plan for the South Ukraine Regional Transmission Network Development including Solar and Wind Power Integration, Ukraine
Master Plan for the South Ukraine Regional Transmission Network Development including Solar and Wind Power Integration, Ukraine
Project Categories
- Transmission
- Renewables
- Consulting
- Power System Studies
DMCC Services
- Load flow
- N-1, N-2 Contingency analysis
- Reneables penetration Study
- Model development
- Study of isolated operation of IPS of Ukraine
- Master planning
Technical Information
- IPS of Ukraine
- 220-750 kV Grid
Client
NPC Ukrenergo, UkraineFinancing
EBRDContractor
DIgSILENT GmbHProject budget
900